Advertisement

You will be redirected to the page you want to view in  seconds.

Maintenance backlogs create school safety risks, fiscal bind

Administrators say referendums are the only way out

7:22 PM, Apr. 7, 2013

A boiler failure shut down Oakwood Elementary, a 60-year-old school in Oshkosh, and forced 100 kids to squeeze into another building for weeks in 2009.

Gaping holes in the Pulaski Middle School roof are causing leaks in classrooms during rainstorms, risking damage to electrical components and the structure. The building is more than 50 years old.

Numerous problems at the 100-year-old Washington Elementary School in Sheboygan prompted school leaders to recommend closing the doors because the building has deteriorated beyond repair. ...

What's your take on the Packers Family Night change?

Retrieving results.
Watching practice is fine.(Your vote)
15%
576 votes
I'd rather watch a scrimmage.(Your vote)
23%
856 votes
I don't want to pay to watch practice.(Your vote)
27%
1018 votes
It doesn't matter to me.(Your vote)
34%
1272 votes

Catch up on the latest in our pregame show every game day.

Football fans

If you've ever answered "Who has the ball?" with "It's halftime," you might recognize The Airhead. Check out the characters in our cartoon gallery of oddball fans.

Special Reports

ORDER YOURS

Football fans

If you've ever answered "Who has the ball?" with "It's halftime," you might recognize The Airhead. Check out the characters in our cartoon gallery of oddball fans.

Special Reports